2008
June
22, 2008 - Heat Muff
June
21, 2008 - Manifold Pressure, Ground Strap, Ignition
June
19, 2008 - Fuel & Oil Hoses, Oil Temp Sensor
June
18, 2008 - EGT Sensors
June
16, 2008 - CHT Sensors
June
15, 2008 - Citabria over Antietam
June
14, 2008 - Rivet Air Seals
June
13, 2008 - RTV Air Seals
June
9, 2008 - Rivet Baffles together
June
7, 2008 - AOPA Open House in Frederick, MD
June
5, 2008 - Bottom Cowl Seals
June
2, 2008 - Epoxy Air Duct
May
31, 2008 - Rivet Spinner nutplates
May
29, 2008 - Match-drill Spinner holes
May
28, 2008 - Spinner, Oil Filler Door
May
27, 2008 - Spinner
May
26, 2008 - Air Ducts, Air Seals, Oil Filler Door
May
25, 2008 - Drill Air Seals to Baffles
May
24, 2008 - Makeing templates for Air Seals
May
22, 2008 - Top Edge Baffle Trimming
May
21, 2008 - Still More Trimming Baffles
May
20, 2008 - More Trimming Baffles
May
19, 2008 - Trimming Baffles
May
18, 2008 - Riveting Baffles
May
14, 2008 - Front/Side/Floor Baffle work
May
11, 2008 - Front Baffles
May
10, 2008 - Side/Floor Baffle Gussets
May
9, 2008 - Floor Baffle Bracket
May
8, 2008 - More Floor/Side Baffles
May 6, 2008 -
Floor/Side Baffles
May 3, 2008
- Will the Floor Baffles ever end?
May
2, 2008 - Still more Floor Baffles
May 1, 2008
- More Floor Baffles
April
30, 2008 - Floor Baffles
April
29, 2008 - Back to the Baffles
April
27, 2008 - Rivet Side Mount Strips & Recepticles
April
26, 2008 - Drilled Side Mount Strips
April
24, 2008 - Rivet Mount Strip & Recepticles
April
23, 2008 - Camloc Grommet/Studs
April 22, 2008
- Drilled Camloc recepticle holes
April
21, 2008 - Spinner prop cutout
April
20, 2008 - Let the Baffling Begin
April
19, 2008 - Drilled Side Camloc backing strips
April
17, 2008 - Fishing the Bay
April
16, 2008 - Will the bottom cowl ever end?
April
15, 2008 - Still more bottom cowl
April
13, 2008 - Even more bottom cowl
April
12, 2008 - More bottom cowl
April
11, 2008 - Start the bottom cowl
April
9, 2008 - Exhaust pipe hangars
April
6, 2008 - Fit the top cowl
April
5, 2008 - Mount Prop
April
4, 2008 - More Spinner BacikPlate
April
2, 2008 - Spinner BacikPlate
April 1, 2008 -
Cherry Blossoms
March
30, 2008 - Install Aft Canopy
March
29, 2008 - Install Prop Governor
March
28, 2008 - Install Exhaust System
March
27, 2008 - Install Alternator
March 25,
2008 - Install Carburator
March
22, 2008 - The Big Move & Engine Mounting
March 21, 2008 - Prep
for the Big Move
March 17,
2008 - Panel Labels
March
16, 2008 - Engine Prep
March
12, 2008 - Rivet Air Vent Brackets
March 9,
2008 - Rivet Firewall Recess
March 8,
2008 - Install AN Shunt, Recess area
March 7,
2008 - HS Tip, Firewall Recess
March 6,
2008 - HS Tip, Fuel Selector Valve Cover
March 5,
2008 - Emp Fairing, HS Tip, Center Cabin Cover
March 4,
2008 - Emp Fairing work
March 2,
2008 - Nav/Strobe light covers
February 28, 2008 -
Nav/Strobe light mounting
February 26, 2008 - Left
Wing Inboard area
February 25, 2008 - Left
Wingtip Nutplates
February 24, 2008 - Left
Wingtip Rib
February 23, 2008 - Left
Wing and wingtip
February 17, 2008 - More
Right Wing
February 16, 2008 - Right
Wingtip
February 14, 2008 - Move
Right Wing
February 12, 2008 -
Center Cabin Cover
February 10, 2008 - Emp
Tips
February 9, 2008 - Ramp
baffle prep, Rage gold filler on Tips
February 8, 2008 - Prime
and cleco #3 and #4 baffles
February 7, 2008 - Oil
Cooler hole in #4 aft baffle
February 6, 2008 - #3
Cylinder Baffle section
February 4, 2008 - More
Baffle work
February 3, 2008 -
Empennage Fairings
February 2, 2008 - Control
Cables/Horizontal Cowl Support strips
January 31,
2008 - #4 Cylinder Baffle
January 30,
2008 - Finish the Firewall Eyeballs/Control Cables
January 29,
2008 - Start the Baffle Kit
January 27,
2008 - Lower Emp Fairing
January 26,
2008 - Big Day
January 24,
2008 - More Emp fairing
January 23,
2008 - Trim/Drill Emp fairing
January 22,
2008 - Start Empennage fairing
January 21,
2008 - Aft Skins done!
January 20,
2008 - Rivet forward top skin
January 19,
2008 - More cowl support strips
January 18,
2008 - Firewall eyeball for prop control cable
January 16,
2008 - Fashioning cowl support strips for camlocs
January 14,
2008 - More riveting and Gear/Wheels
January 13,
2008 - More riveting and Gear/Wheels
January 12,
2008 - Rivet Aft Top Skin
January 11,
2008 - HS & Elevator Tips
January 7,
2008 - Upgrade Dynon Firmware
January 5,
2008 - Rivet Rudder and Elevator Stops
January 4,
2008 - Miscellaneous Stuff
January 3,
2008 - Elevator Hook-up
January
2, 2008 - Elevator Trim and Rudder bottom tip
2007
December
31, 2007 - Tail Light and Trim wiring
December
30, 2007 - Attach tailwheel gear
December
29, 2007 - Shorten Sticks
December
28, 2007 - Control Cable brackets
December
24, 2007 - Run the Static Tubing
December
23, 2007 - Help Bruce rip fabric off Cub and Baby Ace
December
23, 2007 - Cabin Air Vents
December
22, 2007
- Com antenna cable, brake lines
December
21, 2007 - Firewall PassThrough
December
20, 2007 - Aux Power recepticle
December
19, 2007 - Final Wiring
December
16, 2007 - Wiring Light switches
(Strobe, Nav, Land, Taxi)
December
15, 2007
- Miscellaneous Wiring
December 10, 2007 - Wiring Intercom D-Subs
December 9, 2007 - SL-60 Power-up
December 8, 2007 - Wiring SL-60 D-Subs
December 5, 2007 - Finish wiring up the Starter Button and Low Voltage warning light
December 4, 2007 - Finish wiring up the Transponder
December 2, 2007 - Finish wiring the Autpilot, Panel light and
Flap systems
November 29, 2007 - Cabin Heat Control Cable
November 25, 2007 - Power up the Panel for the first time!
November 24, 2007 - Mounting
the Trim Governor
November 23, 2007 - Mounting the Com and Tramsponder antennas
November
22, 2007 - Thanksgiving Day Shop Clean-Up
November
21, 2007 - Foliage flight in the Cub
November
20, 2007 - Rivet Fuse side covers, bolt stick mechanism together
November 19, 2007 - Elevator Push-Rods
November 18, 2007 - Canopy Latch Mechanism
November 13, 2007 - Cut Sticks, route Wires
November
11, 2007 - Strobe Power Supply wires
November 5, 2007 - Aux Jacks, Tail Wires
November 4, 2007 - Run Wires to Wings
November 3, 2007 - Securing Intercom Wires
October 31, 2007 - Running Intercom and Strobe wires
October 29, 2007 - Last flight in the Citabria
October 28, 2007 - Ferrying the Citabria from Annapolis to Essex
October 27, 2007 - Soldering the Intercom Jacks
October 20, 2007 - Strobe Power Supply Molex connectors
October 15, 2007 - Wiring
October 13, 2007 - Merlin Aerodrome, VA Fly-In
October 9, 2007 - Wiring
October 2, 2007 - Wiring
October 1, 2007 - Wiring
September
30, 2007 - Wiring
September
29, 2007 - Hudson River Run - Cub Flight Part Two
September
29, 2007 - Hudson River Run - Cub Flight Part One
September 26,
2007 - Wiring
September 25,
2007 - Wiring
September 21-23, 2007
- Citabria flight to Dayton, Ohio
September 17, 2007 - Rivet Front End
September
16, 2007 - All Grass Tour Part Three
September
16, 2007
- All Grass Tour Part Two
September
16, 2007
- All Grass Tour Part One
September 15,
2007
- Relays, Front End
September 12,
2007 - Main and Essential Buses, Lightspeed box
September 10,
2007 - Battery Bus
September 8,
2007 - Panel & Wiring
September 7,
2007 - Heat Valve
September 5,
2007 - Panel Painted!
September 2,
2007
- Firewall
September 1, 2007 - ADIZ Liberation Day at Essex Skypark
August 25, 2007 - Firewall Forward
August 24, 2007 - Firewall Forward
August 23, 2007 - Firewall Forward
August 21,
2007 - Panel
August 20, 2007 - Engine Arrives!
August 19, 2007 - Firewall Forward
August 15,
2007 - Firewall Forward
August 14,
2007
- Firewall Forward
August 7, 2007 - Panel
August 6, 2007 - Static Ports
August 5, 2007 - Static Ports
August 4, 2007 -
ELT and Aileron boots
August 3,
2007
- Wing fairing nutplates
July 30, 2007 - Wing riveting: flap hinges and fairing nutplates
July 29, 2007 - ELT mount, aux fuel pump, center spar gussets
July 28, 2007 - Mapbox and Strobe Power Supply mount install
July 24-27, 2007 - Oshkosh AirVenture 2007
July 22, 2007 - Panel: Riveting and mapbox
July 20, 2007 - Panel: ELT/Hobbs Meter Holes
July 17, 2007 - Panel: Elevator Trim Indicator/Intercom Holes
July 16, 2007 - Panel: More Switch Holes
July
15, 2007 -
Panel: Switch Holes
July
14, 2007 - Panel: Airspeed/Pictorial Pilot
July 13,
2007 - SubPanel riveting, Vans Order
July 12,
2007 - Cut round holes in Panel
July 11,
2007 - Panel & SubPanel
July
10, 2007 - SubPane, B&C Orderl
July
8, 2007 - Panel & SubPanel
July 6, 2007 - Panel
July 5,
2007 - Panel
July
4, 2007 - Panel
July 2, 2007 - Visit with Repeat Offender
July 1, 2007 - Panel
Jun 30,
2007 - Panel
Jun 28,
2007 - Panel
Jun 24,
2007 - Panel
Jun 21,
2007 - Battery Contactor, Mapbox and Panel
Jun 15,
2007
- Big Wedding
Jun 10, 2007 - Batt Contactor
Jun 3, 2007 - Brake Pedals, Lines & Reservoir
Jun 2, 2007 - Axel and Fuel Lines
Jun 1, 2007 - Wheels
May 28,
2007 - Spinning Wheels
May 26, 2007 - Wheels and Brakes
May 25, 2007 - Tires and Tubes
May 24,
2007 - Wheels
May 23,
2007
- Engine Mount Drilled
May 22, 2007 - Kitfox
May 21, 2007 - Drilling Engine Mount
May 20, 2007 - Fuel Lines/Fuel Selector Valve
May 18, 2007
- Fuel Vent Lines
May 14,
2007
- Fuel Vent Lines
May 10, 2007 - Fuel Vent Lines
May 7, 2007 - Operate Flaps
May 6, 2007 - Flap Hookup
May 5, 2007 - Check ailerons for alignment
May 2, 2007 - London
May 1, 2007 - Flap Pushrods
April 29, 2007 - Drilled Wing Root Fairings
April 28, 2007 - Helped mount wings on Mike's RV-7A
April
26, 2007 -
Fuel Tank Bracket
April
25, 2007 - Drilling Fuse Bottom Skin
April 14,
2007 - Bolt Canopy on and finish drilling Rear Spars
April 12,
2007 - Drilling Rear Spars
April 11,
2007 - Both wings attached!
April
10, 2007 - Sorting Washers
April
9, 2007 - Right wing attached.
April 8, 2007 - More Wing Mounting Prep
April 7,
2007 - Wing Mounting Prep
April
2, 2007 - Canopy Frame
April 1, 2007 - Riveted the Canopy Frame Skin, Reinforcer & Skirts
March 31, 2007 - Painted the Interior
March 30, 2007 - Canopy Frame Reinforcers & taping interior
March 29, 2007 - Riveted Channel Frame
March 25, 2007 - Paint Interior pieces
March 24, 2007 - Prime Canopy Frame components
March 22, 2007 - Canopy Frame Reinforcers
March 21, 2007 - Canopy Frame Reinforcers
March 18, 2007 - Canopy Frame Reinforcers
March 17, 2007 - Gas Strut Mounts
March 14, 2007 - Seats arrive!
March 13, 2007 - Battery Box
March 8, 2007 - Drilling Firewall, Panel
March 7, 2007 - The Dynon FD-180 arrives!
March 5, 2007 -
Battery Box Retainer Bar
March 4, 2007 - Countersinking mania
March 3, 2007 - Canopy frame prep
March 2, 2007 - More drilling of side skirts
March 1, 2007 - Drilling side skirts
February 27, 2007 - Forward Canopy side skirts
February 25, 2007 - Snow & forward canopy
February 24, 2007 - Drilled forward canopy to frame!
February 18, 2007 - Canopy frame
February 14, 2007 - Ice Storm
February 13, 2007 - Canopy frame
February 12, 2007 - Finish riveting wings!
February 11, 2007 - Aft Canopy
February 8, 2007 - Aft Canopy
February 6, 2007 - Aft Canopy
February 5, 2007 - Aft Canopy
February 4, 2007 - Aft Canopy
February 3, 2007 - Rudder Stops
February 2, 2007 - Aft Canopy
January 31, 2007 - Forward Canopy
January 29, 2007 - Forward Canopy
January 28, 2007 - Forward Canopy
January 26, 2007 - Canopy trimming.
January 25, 2007 - Canopy trimming.
January 24, 2007 - Canopy trimming.
January 23, 2007 - Canopy trimming.
January 22, 2007 -
Canopy trimming.
January 21, 2007 - Canopy trimming.
January 20, 2007 - The Big Cut!
January 19, 2007 - Canopy trimming.
January 14, 2007 - Start Cutting the Canopy!
January 13, 2007 - Finally finish the crotch strap bracket install
January 11, 2007 - Crotch strap bracket nutplates, rudder stops
January 10, 2007 - Rudder Stops, Start riveting left bottom skin
January 9, 2007 - Finish mounting VS, hang Rudder
January 7, 2007 - VS rear spar, crotch strap bracket install
January 4, 2007 - Crotch strap bracket install
January 3, 2007 - Canopy prep
January 2, 2007 - More servo and tips.
January 1, 2007 - Wing riveting, trim servo, fiberglass tips.
2006
- December 31, 2006 - Elevator Push-Rod
- December 30, 2006 - Mounting the Vertical Stab to the Fuse
- December 25, 2006 - Christmas Presents.
- December 18, 2006 - Drill Elevator Horns to HS Hinge Bearing
- December 17, 2006 - Finish drilling HS to Fuse
- December 16, 2006 - Drill HS to Fuse
- December 13, 2006 - More Bottom Skin riveting
- December 12, 2006 - Drill Elevator Honrs
- December 11, 2006 - Attach Elevators to Horizontal Stab
- December 9, 2006 - Attach Elevators to Horizontal Stab
- December 7, 2006 - Rivet bottom skin 2 of 4
- December 6, 2006 - Seatbelt anchor bracket
- December 5, 2006 - Rivet the Canopy Frame
- December 2, 2006 - Drilling Canopy Frame
- November 30, 2006 - Oregon Aero Seats, Canopy Frame
- November 25, 2006 - Drilling Canopy Frame, Riveting Bottom Skin
- November 24, 2006 - Side Weldment adjustments
- November 23, 2006 - Thanksgiving Day
- November 22, 2006 - Canopy Frame
-
November 21,
2006 - Aft Canopy Channels
-
November 19,
2006 - Start Riveting Bottom Skin
-
November 15,
2006 - Edge-Smooth Crotch-Strap brackets
-
November
12, 2006 - Still More Forward Canopy Fame
-
November 10, 2006 - More Forward Canopy Fame
-
November 9,
2006 - Forward Canopy Fame
-
November 8,
2006
- Big order from Vans
- November 6, 2006 - More fuel tank leak testing.
- November 5, 2006 - Forward Canopy Frame
- November 3, 2006 - Prosealing the fuel tank access plates
- November 1, 2006 - Fuel Tank Leak Testing
-
October 31, 2006 - Miscellaneous
-
October 29,
2006 - Prosealing the fuel tank access plates
-
October 28,
2006 - Canopy Latch Mechanism
-
October 27, 2006 - Canopy Latch Mechanism
-
October 25, 2006 - Canopy Side Latch
-
October 23
2006 - Canopy Side Latch
-
October 22,
2006
- Canopy Release/Priming
- October 18, 2006 - Rudder Cable Fairings
- October 16, 2006 - Seats
- October 11, 2006 - Forward Upper Fuselage Prep
- October 10, 2006 -
Electrical System Stuff Arrives
-
October 8,
2006
- Forward Upper Fuselage/Start Canopy
-
October 7,
2006 - Forward Upper Fuselage
-
October 6, 2006 - Forward Upper Fuselage
-
October 3, 2006 - SubPanel Reinforcers
-
October 1, 2006 - Stuff in Wing
-
September 27, 2006 - More forward upper fuselage
-
September 24, 2006 - Worked on forward upper fuselage
-
September 23, 2006 - Helped mount an engine
-
September 19, 2006 - Fuel Tank Service Bulletin
-
September 10, 2006 - Finished Cabin Frame, started forward upper fuselage
-
September
2, 2006 -
Pictorial Pilot Install
-
August
31, 2006 - Cabin Frame support bracket
-
August 29, 2006 - Right cabin frame mounting bracket
-
August
28, 2006 - Left cabin frame mounting bracket
-
August 26,
2006 - Priming & Riveting Cabin Frame
-
August 25,
2006 - Prepping Cabin Frame
-
August 24,
2006 - Countersinking Cabin Frame
-
August
23, 2006 - Drilling Cabin Frame
-
August
19, 2006 - More Cabin Frame
-
August 18, 2006 - Cabin Frame
-
August 10,
2006 - Nutplates
-
August
9, 2006 - Lower Forward Fuselage
-
August 1, 2006 - Front Panels
-
July 31, 2006 - Seat Back Braces
-
July 30, 2006 - Forward Seat Floor
-
May 29, 2006 - Putting the fuselage together for a photo-op.
-
May 21, 2006 - Flap actuator assembly
-
May 19, 2006 - Flap motor
-
May 18, 2006 - Rivet right aft seat floor
-
May 16, 2006 - Rivet left aft seat floor
-
May 14, 2006 - Flap mechanism
-
May 13, 2006 - Flap mechanism
-
May 12, 2006 - Flap mechanism
-
May 9, 2006 - Flap mechanism
-
May 8, 2006 - Forward Cover
-
May 5, 2006 - Forward Cover
-
May 1, 2006 - Seat Tunnel & Forward Covers
- April 16, 2006 - Seat Floor Tunnel Cover
- April 14, 2006 - Seat Floors
- April 13, 2006 - Baggage Bulkheads
- April 12, 2006 - Still more Upper Baggage Bulkhead
- April 11, 2006 - More Upper Baggage Bulkhead
- April 10, 2006 - Upper Baggage Bulkhead
- April 8, 2006 - Lower Baggage Bulkhead
- April 7, 2006 - Rivet Baggage Area Floors
- April 6, 2006 - Rivet Baggage Area Side Panels
- April 4, 2006 - Rudder Cables
- April 1, 2006 - Rivet Seats
- March 31, 2006 - Prep and Prime Seats
- March 29, 2006 - Seat Braces
- March 28, 2006 - Drill Right Seat
- March 25, 2006 - Drill Left Seat
- March 24, 2006 - Seat Backs
- March 22, 2006 - Baggage Floor Door
- March 21, 2006 - Rivet Aft Seat Floor hinges
- March 19, 2006 - Aft Seat Floor
- March 9, 2006 - Baggage Area
- March 8, 2006 - Organizing Finish Kit Hardware
- March 7, 2006 - Baggage Area
- March 5, 2006 - Inventorying Finish Kit/Baggage Area
- March 4, 2006 - Finish Kit is in the House!
- February 28, 2006 - Deburring and dimpling Aft Upper Fuse
- February 26, 2006 - Aft Upper Fuselage Skin
- February 25, 2006 - Rear Upper Fuselage Skin
- February 24, 2006 - Rivet Canopy Decks
- February 23, 2006 - Rivet left F-705 bracket & F-757 gusset
- February 22, 2006 - Rivet right F-705 bracket & F-757 gusset
- February 21, 2006 - Rivet Fwd Fuse Gussets
- February 19, 2006 - Shoulder harness anchors, bulkhead gussets, wood stand
for fuse
- February 18, 2006 - F-695 Fwd Fuse Gussets
- February 15, 2006 - Drilled Fwd Canopy Deck
- February 14, 2006 - Drilled F-757 Gusset
- February 12, 2006 - Trimmed Aft Canopy Deck
- February 11, 2006 - Riveted aft deck
- February 9, 2006 - Aft deck spacers
- February 8, 2006 - Drilling aft deck
- February 7, 2006 - Adjust saw horses
- February 6, 2006 - The Canoe Is Flipped!
- February 4, 2006 - More Misc Prep Work
- February 2, 2006 - Misc Prep Work
- January 28, 2006 - Rivet Forward Fuse
- January 27, 2006 - Squeezing Rivets
- January 24, 2006 - Bolting and Riveting Fuse
- January 23, 2006 - Riveting Fuse
- January 22, 2006 - Pre-Riveting Forward Fuse
- January 21, 2006 - F-704 Bulkhead bolting
- January 15, 2006 - Priming complete.
- January 14, 2006 - Clean the parts and some final prep
- January 11, 2006 - Countersinking, Dimpling with the C-Frame
- January 8, 2006 - More Countersinking Longerons
- January 7, 2006 - Countersinking Longerons
- January 5, 2006 - Skin Prep
- January 1, 2006 - Disassemble
the fuselage
2005
- December 31, 2005 - Lower Fuselage
- December 30, 2005 - Rudder and Brake Pedals
- December 29, 2005 - Rudder Pedals
- December 27, 2005 - Brake Pedals
- December 26, 2005 - Forward Fuselage
- December 25, 2005
- New Tools from Santa
- December 24, 2005 - F-902 Bulkhead
- December 23, 2005 - Forward Fuselage.
- December 22, 2005 - Forward Fuselage Lower Longerons.
- December 19, 2005 - Forward Fuselage Stiffeners.
- December 17, 2005 - Auxiliary Longerons.
- December 14, 2005 - The Firewall is drilled!!
- December 12, 2005 - Preparing to drill the Firewall.
- December 11, 2005 - Lots of drilling.
- December 10, 2005 - Forward fuselage, drilling longerons.
- December 9, 2005 - Forward fuselage.
- December 8, 2005 - Center and Aft Fuse are Joined!
- December 7, 2005 - Preparing to join the Center and Aft Fuse
- December 5, 2005 - Longerons complete!
- December 4, 2005 - Bending the longerons
- December 3, 2005 - Center fuselage seat and baggage rib covers
- December 2, 2005 - Finish riveting the center fuselage skin
- November 30, 2005 - Riveting the center fuselage skin
- November 26, 2005 - More riveting the center fuselage
- November 25, 2005 - Riveting the center fuselage
- November 22, 2005 - More center fuselage prep
- November 20, 2005 - More center fuselage prep
- November 19, 2005 - Center fuselage prep
- November 10, 2005 - Start prepping center fuselage
- November 9, 2005 - Finish riveting the aft fuse
- November 3, 2005 - Riveting the aft fuse together
- October 30, 2005 - Aft Fuse - Riveting the Tailcone
- October 16, 2005 - Center Fuselage
- October 15, 2005 - Center Fuselage
- October 14, 2005 - Center Fuselage
- October 12, 2005 - Center Fuselage
- October 11, 2005 - Center Fuselage bottom skin clecoed.
- October 10, 2005 - Center Fuselage bulkhead & ribs clecoed.
- October 9, 2005 - Center Fuselage ribs
- September 23, 2005 - Center Fuselage - Spacers
- September 21, 2005 - Aft Fuselage - Dimpling
- September 17, 2005 - Aft Fuselage - Devinyling, Deburring and Bracket
- September 13, 2005 - Aft Fuselage - Drilling holes
- September 12, 2005 - Aft Fuselage - J-Stringers
- September 7, 2005 - Tailcone Trifecta
- September 2, 2005 - Tailcone Part Deux.
- August 29, 2005 - Clecoed together Aft fuselage!
- August 28, 2005 - J-Stringers
- August 26, 2005 - Tailcone
- August 24, 2005 - Cleaned and rearranged shop, started aft fuselage.
- August 23, 2005 - Bulkheads complete!
- August 22, 2005 - Riveted Bulkheads
- August 21, 2005 - F-712 Bulkhead, Priming
- August 20, 2005 - F-711 Bulkhead
- August 16, 2005 - F-707/708/709/710 Bulkheads
- August 15, 2005 - F-706 Bulkhead
- August 11, 2005 - F-705 Bulkhead Complete!
- August 10, 2005 - F-705 Bulkhead
- August 9, 2005 - F-705 Bulkhead
- August 8, 2005 - F-705 Bulkhead
- July 30, 2005 - F-705 Bulkhead
- July 25, 2005 - F-705 Bulkhead
- July 24, 2005 - F-705 Bulkhead
- July 19, 2005 - F705 Bulkhead
- July 2, 2005 - F704 Bulkhead
- July 1, 2005 - F704 Bulkhead
- June 30, 2005 - F704 Bulkhead
- June 29, 2005 - F704 Bulkhead
- June 28, 2005 - F704 Bulkhead
- June 17, 2005 - Start the F-704 bulkhead
- June 16, 2005 - Rivet the firewall. Firewall complete!
- June 14, 2005 - Prime the firewall
- June 12, 2005 - Deburring, dimpling, and countersinking the firewall
- June 11, 2005 - Match-drilling the firewall
- June 6, 2005 - Clecoing stiffeners and doublers to the firewall.
- June 4, 2005 - Firewall
- June 3, 2005 - Firewall.
- June 1, 2005 - Inventorying and organizing the Fuselage Kit.
- May 27, 2005 - Fuselage Kit has arrived!
- May 9, 2005 - Working on the
Kitfox
- Fiberglass Tips
- Right Wing
- March 31, 2005 - Flap Brace/Hinge
- March 26, 2005 - Align Aileron
- March 25, 2005 - Rudder & Elevator Bearing Rods
- March 23, 2005 - Hang Aileron
- March 20, 2005 - Riveted on the aileron hinge brackets.
- March 19, 2005 - The right wing is off the jig and in the stand.
- March 13, 2005 - Attach Fuel Tank to Spar, hang top skins
- March 9, 2005 - Rivet Leading Edge to main spar.
- March 8, 2005 - Wing Prep: deburring, dimpling, countersinking
- March 7, 2005 - Landing Light complete.
- March 5, 2005 - Landing Light
- March 2, 2005 - Rivet Leading Edge together
- February 27, 2005 - Leading Edge prep
- February 24, 2005 - Tiedown Bracket, Leading Edge prep
- February 23, 2005 - Fuel Tank Prep
- February 22, 2005 - Fuel Tank Fitting
- February 19, 2005 - Leading Edge.
- February 17, 2005 - Drilled bottom skins.
- February 15, 2005 - Drilled top skins.
- February 12, 2005 - Updated Wing jig.
- February 6, 2005 - Primed ribs.
- February 4, 2005 - Cleco spars
and ribs together.
- Right Aileron
- Right Flap
- Left Flap
- Left Aileron
- Left Wing
- January 16, 2005 - Attach Flap
- January 12, 2005 - Attach Bellcrank and Aileron
- January 10, 2005 - Long Aileron Control Rods
- January 9, 2005 - Riveting the Flap Brace and Aileron Gap Fairing
- January 8, 2005 - Riveting the Aileron Brackets
- January 3, 2005 - Matchdrilling the Flap Brace and Aileron Gap Fairing
- January 1, 2005 -
Building the Wing Stand.
- December 31, 2004 - Short Aileron Control Rods
- November 22, 2004 - Top skins riveted to Wing
- October 31, 2004 -
Riveted leading edge
- October 23, 2004 -
Final Wing Prep
- October 22, 2004 -
Landing Light, Leading Edge
- October 16, 2004 -
Landing Light continued
- October 15, 2004 -
Landing Light
- October 13, 2004 -
Wing Prep
- October 5, 2004 - Wing
Prep
- October 1, 2004 - Wing
Skin Prep
- September 23, 2004 -
Deburring Skins
- September 21, 2004 -
Deburring and Dimpling Ribs
- September 11, 2004 -
Beach
- September 8, 2004 -
Leading Edge
- September 4, 2004 -
Hung the wing bottom skins
- September 3, 2004 -
Hung the wing top skins
- September 2, 2004 -
Building the wing jig
- August 21, 2004 -
Rivet the left wing structure
- August 15, 2004 -
Cleco the left wing together.
- August 14, 2004 -
Finished prepping wing ribs!
- July 20, 2004 - Start prepping ribs
- July 18, 2004 - Rivet Rear Spar
- July 12, 2004 - More Rear Spar prep
- July 10, 2004 - Rear Spar prep
- July 5, 2004 - Tiedown brackets
- June 28, 2004 - Will these nutplates ever end?
- June 26, 2004 - Still more countersinking and riveting nutplates
- June 23, 2004 - More countersinking and riveting nutplates
- June 16, 2004 - Countersinking the Wing Main Spar for nutplates.
- May 24, 2004 - The Wing
Kit is in the house!
- Left Elevator
- Right Elevator
- Rudder
- May 2, 2004 - Rudder Trailing Edge
- April 27, 2004 - Riveting Rudder
- April 26, 2004 - Miscellaneous Rudder
- April 23, 2004 - Rudder top and bottom ribs.
- April 9, 2004 - Rudder trailing edge and riveting spar reinforcers
- April 8, 2004 - Counterbalance rib and counterweight
- April 4, 2004 - Deburring and dimpling the skin edges
- April 3, 2004 - Clecoing the Rudder together
- March 23, 2004 - Back-Riveting the stiffeners/skin
- March 21, 2004 - Rudder Spar and Horn
- March 18, 2004 - Deburring skins
- March 15, 2004 - Making
stiffeners
- Vertical Stabilizer
- Horizontal Stabilizer
- February 27, 2004 -
Riveting. HS complete.
- February 26, 2004 -
Skins, deburring and dimpling
- February 25, 2004 -
Forward Spar, riveting
- February 24, 2004 - Rear
Spar, riveting
- February 23, 2004 - Rear
Spar, riveting
- February 20, 2004 -
Priming
- February 17, 2004 - Left
HS, drill spar/ribs
- February 14, 2004 -
Right HS, cleco together
- February 12, 2004 - Left
HS, cleco together
- February 3, 2004 - Foward Spar
- February 2, 2004 - Forward Spar Reinforcers
- January 30, 2004 - The
Beginning. Rear Spar Reinforcers
- Initial Preparation
|